CHSN Building Maintenance Status log

Below is a listing of building maintenance requests that have been made to our facilities department and the status of the work being done on them.


 

Request

Status

Completion Date

Existing exterior sewer lines - Make repairs in two areas outside of building that are partial collapsed. Damage of lines discovered by video camera performed by sewer cleaning company.
 

Estimates are being obtained and work is being scheduled.
 

In Progress

Girls locker room needs updating. Broken lockers should be replaced and holes in the ceilings fixed.

1- Annex Locker room ceiling was repaired. COMPLETED!
2- Prices being obtained for locker replacement.

  • Girls – Main Locker Room - $55,780

  • Girls – Annex Locker Room - $41,388

  • Boys - Main Locker Room - $55,083

  • Boys - Annex Locker Room - $46,087

3- Painting is scheduled for the weekend of December 22nd. COMPLETED!

In Progress

Light fixtures that are old and broken need replacement.

Light fixtures are being checked and replaced with new fixtures as needed. We have identified 164 light fixtures that need replacement.

In Progress

Additional areas in need of painting should be addressed

1. A survey will be developed on the additional areas that need painting.
2. Painting of classrooms and hallways on the second floor of the main building has begun. Rooms 235, 239, 197A, Boiler Room floor, and kitchen office floor was painted. Rooms 221, 223, 225 and 233 have been painted. 3. Six stairways need painting. COMPLETED!

In Progress

Cafeteria furniture needs to be replaced.

1- Cafeteria furniture is being selected and ordered. Chairs are in; waiting for delivery of tables.
2- Floors are being replaced as part of and EXCEL Project (Summer 2008)
3- Painting of walls and ceilings will be scheduled during winter or spring recess. Painting will be done week of Feb 18th.

In Progress

Maintenance dollars need to be allocated where needs exist (additional monies from the budget need to be earmarked for Clarkstown North.)

Is being addressed.

In Progress

Designate additional custodial staff to Clarkstown North.

The Facilities Dept is reviewing our current cleaning specifications and will be retraining all our custodians.
1- Cleaning Specifications were revised and completed. 11/26/07
2- Retraining of staff will begin on 12/10/07 and will take approximately 30 days. Training In Progress.
Two additional custodians have been added to NHS night staff. A new weekend supervisor for NHS started the weekend of Dec. 8th. COMPLETED!

In Progress

Summer school must be moved to a different location so that these repairs can be expedited when there are no students in the building.

District is reviewing the policy.

Summer School will be held at South High School

COMPLETED!

Boys locker room needs updating. Broken lockers should be replaced and holes in the ceilings fixed.

1-Annex Locker room ceiling needs repair. COMPLETED!
2-Painting is being scheduled. COMPLETED!
3-Prices being obtained for locker replacement. COMPLETED!

COMPLETED!

The roach issue must be addressed immediately. It is obvious that the current plan is not effective (these roaches have been around for numerous years!).

1- Removing debris and HEPA vacuum clean the tunnels in the main and annex building. COMPLETED! 12-30-07 
2- Dusting with tunnels with roach bait started in main building and will follow behind the cleaning.
COMPLETED!
3- Video of tunnels
COMPLETED! 11/24/2007
4- Pressure washing of interior and exterior sewer lines and video interior of pipes.
COMPLETED! 12-29-07

 

12-30-07

Main locker room floor needs to be painted

COMPLETED !

11-30-2007

Install new soap and paper towel dispensers

a) Sanitation dispensers were installed at the lunch line in both cafeterias, the nurse's office, library, weight room and  trainers office-
COMPLETED 11-13-07
b) New Soap dispensers were installed in all boys and girls and faculty bathrooms
COMPLETED 11-12-07
c) 24 new paper towel dispensers are on order for bathrooms Completed 11-26-2007
d) Additional (fire rated) trash cans were ordered for the corridors.
COMPLETED 11-26-07

11-26-2007

Curtains and blinds in room 307 need replacing. They are old and beyond looking "decent."

COMPLETED !

11-23-2007

Curtains and blinds in rooms 308 need replacing. They are old and beyond looking "decent."

COMPLETED !

11-23-2007

Curtains and blinds in rooms 317 need replacing. They are old and beyond looking "decent."

COMPLETED !

11-23-2007

Unit Ventilators

a) The annex building was checked and all are working except Rm 514.  Unit was ordered 11-09-07
b) The new addition is being checked by tile manufacturer's service contractor.

COMPLETED !

11-23-2007

Holes in the ceilings of Main Building should be closed up, and ceiling tiles that are broken should be replaced.

COMPLETED !

11-21-2007

Install 21 new electrical outlets for SmartBoard projectors

All rooms completed except for (4) rooms: Rms 167, 507, 221 and 513 COMPLETED !

11-21-2007

Removal of Diseased Trees

Removed two Trees COMPLETED !

11-19-2007

If maintenance is working day, night and weekends, as stated in the department overview, repairs should be done at the set times. This includes school holidays when the building is empty.

a) Hiring New Maintenance Mechanic for night staff.
b)Transferring on maintenance position from day to night staff.

COMPLETED !

11-15-2007

Room 246- New Wing- Light bulbs need to be replaced in two light fixtures in outer office.

COMPLETED !

11-14-2007

Coping along flooring must be repaired and replaced.

COMPLETED !

11-13-2007

Curtains and blinds in room 408 need replacing. They are old and beyond looking "decent."

All old curtains were removed and new shades are being installed in rooms 408
COMPLETED !  

11-3-2007

Curtains and blinds in rooms 407 need replacing. They are old and beyond looking "decent."

All old curtains were removed and new shades are being installed in rooms 407
COMPLETED !  

11-3-2007

Curtains and blinds in rooms 419, need replacing. They are old and beyond looking "decent."

All old curtains were removed and new shades are being installed in rooms 419
COMPLETED !

11-3-2007

Curtains and blinds in rooms 420 need replacing. They are old and beyond looking "decent."

All old curtains were removed and new shades are being installed in rooms 420,
COMPLETED !  

11-3-2007

Curtains and blinds in rooms 421  need replacing. They are old and beyond looking "decent."

All old curtains were removed and new shades are being installed in rooms 421
COMPLETED !

11-3-2007

Holes in the ceilings of Annex should be closed up, and ceiling tiles that are broken should be replaced.

Annex ceilings were checked
COMPLETED !

11-1-2007

Main building hallways need to be painted

COMPLETED!

10-29-2007

Mansion hallways need to be painted

COMPLETED!

10-29-2007

Columns outside mansion need to be painted

COMPLETED!

10-29-2007

The rug in the mansion should be replaced as it is filthy, frayed and a tripping hazard. It is beyond cleaning and an embarrassment to the taxpayers of this district.

New Carpet was installed at the Mansion and Main entrance; Asst . Principal's Office
COMPLETED!

10-29-2007

 

 


© 2007 Clarkstown Central School District . 62 Old Middletown Road . New City, NY . 10956 . 845.639.6300